Overview

Nam Dinh Vu Port (NDV) is one of Gemadept Corporation key projects. Nam Dinh Vu Port not only stands out with the most favorable location and the largest scale but also with the capacity to receive the largest ship in Dinh Vu area - a vessel size is up to 48.000 DWT. Project is planned with the scale of 7 terminals in a total area of more than 65 hectares.

  • Length of pier: 1.5 km
  • Total investment capital: up to 6,000 billion VND
  • Capacity: nearly 2 million Teus and 3 million tons/year

This port owns a favorable location anticipating the trend of moving goods from the upstream area and following Gemadept Corp footsteps. Nam Dinh Vu Port is located at Nam Dinh Vu industrial zone - the most important domestic and international commercial transport hub in Northern region (at Bach Dang river mouth with deep draft and wide turning basin), therefore, Nam Dinh Vu Port is the closest gateway through the sea compared to other ports in Hai Phong area. Nam Dinh Vu Port is on the same traffic axis - connecting Hai Phong Gemadept port chain:

  • Nam Hai ICD Port (3.5 km away)

Nam Dinh Vu Port was born to promote Northern economic growth and become a strategic link connecting economic belts in the chain of logistics activities across the country. At the same time, Nam Dinh Vu Port marked an important turning point that significantly changed Gemadept's position and become leading port operator in Hai Phong area.