{"id":4370,"date":"2023-05-25T05:08:23","date_gmt":"2023-05-24T22:08:23","guid":{"rendered":"https:\/\/ndv.gemadept.com.vn\/opening-ceremony-of-nam-dinh-vu-port-phase-ii-2\/"},"modified":"2025-07-24T13:56:36","modified_gmt":"2025-07-24T06:56:36","slug":"opening-ceremony-of-nam-dinh-vu-port-phase-ii-2","status":"publish","type":"post","link":"https:\/\/ndv.gemadept.com.vn\/en\/opening-ceremony-of-nam-dinh-vu-port-phase-ii\/","title":{"rendered":"Opening ceremony of Nam Dinh Vu Port (Phase II)"},"content":{"rendered":"<p style=\"margin-left:0in; margin-right:0in; text-align:justify\"><em><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\"><strong>On May 24, Gemadept Joint Stock Company (Gemadept) held the opening ceremony of phase II of Nam Dinh Vu Port&nbsp;at Nam Dinh Vu Industrial Zone (IZ), Hai Phong City.<\/strong><\/span><\/span><\/em><\/p>\n<p><span style=\"font-size:11.0pt\"><span style=\"font-family:&quot;Calibri&quot;,sans-serif\">Nam Dinh Vu port cluster is the key port in the North in the integrated Port and Logistics ecosystem of Gemadept Joint Stock Company (Gemadept &#8211; Stock code: GMD).<\/span><\/span><\/p>\n<p><span style=\"font-size:11.0pt\"><span style=\"font-family:&quot;Calibri&quot;,sans-serif\">The port owns a favorable location in Nam Dinh Vu IZ&nbsp;&#8211; the most important international and domestic commercial goods transportation hub of the entire North. Located right at the mouth of Bach Dang River with a deep draft and wide turning basin, Nam Dinh Vu port is the closest gateway to the sea compared to other ports in the region. The port is located on the same traffic route connecting Gemadept&#39;s port system&nbsp;in Hai Phong.<\/span><\/span><\/p>\n<figure class=\"easyimage easyimage-full\"><img decoding=\"async\" alt=\"\" sizes=\"100vw\" src=\"https:\/\/media.gemadept.com.vn\/file\/2yRVbAAeX\" srcset=\"\" width=\"1000\" \/><figcaption>Delegates pressed the button to open phase II of Nam Dinh Vu port.<\/figcaption><\/figure>\n<p style=\"margin-left:0in; margin-right:0in; text-align:justify\"><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\">The area of the entire port cluster is 65 hectares, and the total design capacity of 3 phases is 2 million TEU\/year. Possessing 7 berths spanning 1.5 km and the capacity to receive container ships of up to 48,000DWT, when completed, the Nam Dinh Vu port cluster will be the largest and most scaled river port in the North, able to accommodate the largest feeder ships and intra-Asian ships in the river port area.<\/span><\/span><\/p>\n<p style=\"margin-left:0in; margin-right:0in; text-align:justify\"><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\">&ldquo;Fulfilling commitments to the Government and People&#39;s Committee of Hai Phong City, Gemadept Corporation and its partner Sao Do Group have invested and put into operation Nam Dinh Vu port cluster phase I since 2018. And today, Nam Dinh Vu port cluster phase II was officially put into operation,&quot; Mr. Do Cong Khanh, Deputy General Director of Gemadept, said at the ceremony.<\/span><\/span><\/p>\n<figure class=\"easyimage easyimage-full\"><img decoding=\"async\" alt=\"\" sizes=\"100vw\" src=\"https:\/\/media.gemadept.com.vn\/file\/SJOkziX8F\" srcset=\"\" width=\"2218\" \/><figcaption><em>Mr. Do Cong Khanh, Deputy General Director of Gemadept Joint Stock Company spoke at the ceremony.<\/em><\/figcaption><\/figure>\n<p><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\">The area of the two&nbsp;phases is 42ha, 880m of berth length, and a capacity of 1.2 million TEU\/year. The port is built and invested synchronously in infrastructure, equipment, and technology according to international, modern, and environmentally friendly standards. &ldquo;With the policy of sustainable development and optimization of operational efficiency, Gemadept develops Nam Dinh Vu Port Cluster and other ports in Gemadept&#39;s ecosystem in the direction of &#39;Smarter and Greener&#39;&quot;, Mr. Khanh affirmed.<\/span><\/span><\/p>\n<figure class=\"easyimage easyimage-full\"><img decoding=\"async\" alt=\"\" sizes=\"100vw\" src=\"https:\/\/media.gemadept.com.vn\/file\/dKA9Tkrbw\" srcset=\"\" width=\"669\" \/><figcaption><em>Nam Dinh Vu Port in 2 phases can receive 4 feeder ships simultaneously.<\/em><\/figcaption><\/figure>\n<p style=\"margin-left:0in; margin-right:0in; text-align:justify\"><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\">Gemadept has researched and chosen to cooperate with the world&#39;s leading mining equipment manufacturing companies to equip Nam Dinh Vu Port with high-performance, electrically operated, and energy-saving equipment. Minimize dust, noise, and reduce greenhouse gas emissions into the environment.<\/span><\/span><\/p>\n<p><span style=\"font-size:11.0pt\"><span style=\"font-family:&quot;Calibri&quot;,sans-serif\">Continuing to invest and improve the capacity of the port and logistics ecosystem to meet market demand, Gemadept will soon deploy phase 3 of the Nam Dinh Vu Port Cluster to put into operation in 2025. When completed Investing in all 3 phases, Nam Dinh Vu port cluster will maximize its advantages, bringing outstanding values to customers and partners.<\/span><\/span><\/p>\n<figure class=\"easyimage easyimage-full\"><img decoding=\"async\" alt=\"\" sizes=\"100vw\" src=\"https:\/\/media.gemadept.com.vn\/file\/nsLxaUQVu\" srcset=\"\" width=\"3104\" \/><figcaption><em>Nam Dinh Vu Port will be the largest river port in the Northern region when completing 3 phases.<\/em><\/figcaption><\/figure>\n<p style=\"margin-left:0in; margin-right:0in; text-align:justify\"><span style=\"font-size:11pt\"><span style=\"font-family:Calibri,sans-serif\">Gemadept in the South with Gemalink super deep-water port and satellite ports, Gemadept&#39;s northern port cluster will grow strongly and actively contribute to building and developing large-scale and modern Vietnamese seaport infrastructure. , best-serving trade between Vietnam and countries around the world.<\/span><\/span><\/p>\n<p><em>Source:&nbsp;<a href=\"https:\/\/baodautu.vn\/gemadept-khai-truong-giai-doan-ii-cang-nam-dinh-vu-d190457.html\" target=\"_blank\" rel=\"noopener\">Gemadept khai tr\u01b0\u01a1ng giai \u0111o\u1ea1n II C\u1ea3ng Nam \u0110&igrave;nh V\u0169 (baodautu.vn)<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On May 24, Gemadept Joint Stock Company (Gemadept) held the opening ceremony of phase II of Nam Dinh Vu Port&nbsp;at Nam Dinh Vu Industrial Zone (IZ), Hai Phong City. Nam Dinh Vu port cluster is the key port in the North in the integrated Port and Logistics ecosystem of Gemadept Joint Stock Company (Gemadept &#8211; [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":4143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[67],"tags":[],"class_list":["post-4370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-activities"],"acf":[],"_links":{"self":[{"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/posts\/4370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/comments?post=4370"}],"version-history":[{"count":1,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/posts\/4370\/revisions"}],"predecessor-version":[{"id":4416,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/posts\/4370\/revisions\/4416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/media\/4143"}],"wp:attachment":[{"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/media?parent=4370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/categories?post=4370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndv.gemadept.com.vn\/en\/wp-json\/wp\/v2\/tags?post=4370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}